No.
|
Thermal generating unit
|
Enterprise
|
Works performed
|
Result
|
Notes
|
|
1.
|
Heating furnaces
|
Metallurgical Plant KAMASTAL, OOO
|
Lining of heating furnace No. 9 in workshop No. 28 with a special mortar (masonry mortar) and protective coating
|
Application of the materials resulted in extension of service life by more than twice.
|
After 19 months the furnace is still in operation
Formerly the furnace used to be repaired every 8 months.
|
|
2.
|
Barium high temperature salt bath furnace
|
Kolomensky Zavod, OAO
|
Lining of salt bath furnace (BaCl2) with chamotte bricks, a special mortar (masonry mortar) and protective coating
|
Service life of the lining is extended by more than 8 times, the lining MK-72 is changed to chamotte bricks.
|
After 10 months of operation, 3 upper coursers are changed, lining is still in operation.
Molten salt does not percolate into the lining.
Formerly, the bath used to be repaired every 2-3 months, after application of the proposed materials the bath furnace has operated for 24 months until capital repair.
|
|
3.
|
Boiler lining
|
Bryansky Mashinostroitelny Zavod, OAO
|
Lining of boiler with chamotte refractory materials, special mortar (masonry mortar) and protective coating
|
Service life of the lining is extended by more than 3.5 times.
|
|
|
4.
|
Trunks
|
Bryansky Mashinostroitelny Zavod, OAO
|
Lining of trunks with chamotte refractory materials, special mortar (masonry mortar) and protective coating
|
Service life extended by 2.4 times.
|
|
|
5.
|
Shell boilers
|
Remeks Energo, OOO
|
Application of the protective coating to the fibrous lining of boiler cover
|
Service life of the lining is extended by more than twice.
|
|
|
6.
|
Hot dip wire galvanizing bath furnace
|
OSPAZ, OAO, Orel
Severstal-Metiz
|
Masonry performed by means of masonry mortar KR-1 and the protective coating M-1
|
Furnace has been in operation for 3.5 years, there has been no complaints concerning the lining.
|
For 42 months of operation there have been no complaints concerning the masonry. Zink does not percolate into masonry. Furnace is still in operation.
|
|
7.
|
Forge furnace lining
|
Antonov, OAO
|
Lining with chamotte refractory materials, special mortar KR-1 and protective coating M-1
|
Furnace has been in operation for 2 years.
|
|
|
8.
|
Electric arc furnace crowns
|
Bryansky Mashinostroitelny Zavod, ZAO
|
Lining of furnace crowns with magnesian refractory materials, masonry mortar KR-KhP-1 and protective coating M-KhP-1
|
Service life extended by 1.5-2 times.
|
|
|
9.
|
Rotating chamotte burning furnaces No.2
|
Nikomogneupor, OOO
|
Lining of unloading area with KR-1 and protective coating M-1
|
Period between repairs is significantly extended. Low abrasive wear.
|
Furnace has been in operation since Jan. 25, 2008 up to the present time without any repairs of unloading area
|
|
10.
|
Rotating cement kiln No.6
|
Oskoltsement, OAO
|
Lining of cooling area with KR-1 and protective coating M-1
|
For 176 days of kiln operation the lining has worn by 15 mm instead of 70 mm
|
Abrasive wear has decreased by more than 4 times. Kiln is still in operation.
|
|
Note: repair of linings of cooling units of rotating cement kilns with masonry mortar KR-1 shall extend the service life by more than twice.
|